The Revenue Pyramid
One machine. Every wire visible.
This is the system we install, as a working model. Build it in order from the menu. Click a layer to pop its graph open. Knock a foundation block out and watch everything above it feel the load. Then drag the divider — the full spec is every sub-system we actually build.
Drag the divider to wipe between the simple view and the full spec. Drag anywhere else to orbit; add the next layer from the layer menu on the left of the graph, the pulsing + BUILD ring, or the build order above; click a layer to pop it open; click a node to knock it out — the forecast feels everything.
Why the pyramid
Foundation before expansion. Always.
The model enforces what the engagement enforces: Scale stays locked until Systems is built; Exit stays locked until Scale is online. That isn't a gimmick — it's the build order that keeps growth from being stacked on sand, and it's why the forecast compounds instead of spiking and dying.